Commenting open: September 17, 2024 12:00AM PT - October 17, 2024 11:59PM PT.
Microsoft East Wenatchee Data Center 30 Day Public Comment Period Sept. 17, 2024 - Oct. 17, 2024
This is a 30-day public comment period for the review of Microsoft East Wenatchee Data Center's draft permit, technical support document, and notice of construction (NOC) application with associated documents. Comment Period is September 17, 2024, 12:00 a.m. through October 17, 2024, 11:59 p.m.
Microsoft is proposing to expand its existing data center in East Wenatchee. Microsoft proposes to construct and operate two more data centers (EAT06, and EAT09) at 875 Urban Industrial Way, in East Wenatchee. The new data centers will include an additional 20 3.0-MWe generators and 2 0.5-MWe generators.
The 20 3.0‑MWe generators will meet state and federal emission standards. They will be equipped with:
Passive catalyzed diesel particulate filters
Selective catalytic reduction to reduce emissions
We determined this proposal satisfies the requirements of Chapter 173-400 WAC.
The public is invited to comment.
View project documents online.
Comment period ends Thursday, October 17, 2024, 11:59 p.m.
Contact Information
*Indicates Required Fields
Thank you for subscribing to the Microsoft East Wenatchee Data Center 30 Day Public Comment Period Sept. 17, 2024 - Oct. 17, 2024 mailing list.
This is a 30-day public comment period for the review of Microsoft East Wenatchee Data Center's draft permit, technical support document, and notice of construction (NOC) application with associated documents. Comment Period is September 17, 2024, 12:00 a.m. through October 17, 2024, 11:59 p.m.
Microsoft is proposing to expand its existing data center in East Wenatchee. Microsoft proposes to construct and operate two more data centers (EAT06, and EAT09) at 875 Urban Industrial Way, in East Wenatchee. The new data centers will include an additional 20 3.0-MWe generators and 2 0.5-MWe generators.
The 20 3.0‑MWe generators will meet state and federal emission standards. They will be equipped with:
We determined this proposal satisfies the requirements of Chapter 173-400 WAC.
The public is invited to comment.
View project documents online.
Comment period ends Thursday, October 17, 2024, 11:59 p.m.